‹ back Intel – FAB 18 Plant, Kiryat Gat Main Page › Projects › Intel – FAB 18 Plant, Kiryat Gat Location: Kiryat Gat Client: Intel Period: 1997-1998 Budget: $16,000,000 Project Description: Construction of the very high-voltage substation at the FAB 18 plant in Kiryat Gat with high and low-voltage electrical systems.