Intel – FAB 18 Plant, Kiryat Gat

  • Location:
    Kiryat Gat
  • Client:
    Intel 
  • Period:
    1997-1998 
  • Budget:
    $16,000,000 
  • Project Description:

    Construction of the very high-voltage substation at the FAB 18 plant in Kiryat Gat with high and low-voltage electrical systems.